Jacksonville Housing Development

The US$4,600,000 housing development involves the development of 8.5 Hectares of land in an equity arrangement between The National Housing Trust and Pan Caribbean Sugar Company Ltd. at Jacksonville in the vicinity of Lionel Town in Clarendon as part of the Sugar Housing Programme Phase 2 .The development consists of 97 serviced lots. The infrastructure works consist of roads, potable water distribution systems, storm water drainage system, on-lot sewage disposal system and electrical distribution.
GDM provided the following services:
GDM was engaged to provide all civil design and construction management services for the project for: Road design, Water supply design, On lot sewage design, Drainage design and Social infrastructure design.

project Details

Client:

National Housing Trust

Location:

Clarendon, Jamaica

Cost:

US$4,600,000.00